achievements
significant achievements
Field experience, concrete projects

For over twenty years, Studio Campioni has been supporting companies, public bodies, and major international players in the implementation of complex and strategic projects in the topographical, electrical, and infrastructure sectors.
In this section, we present a selection of our most significant projects, carried out in Italy and abroad: from feasibility studies for high-voltage transmission networks to specialized work on power lines, foundations, and topographic surveys.
Every project reflects our commitment to precision, quality, and technical innovation.

YEARDESCRIPTIONCUSTOMER
In progressPre-feasibility study and other studies for the upgrading of the transmission network in Bangladesh.
Preliminary feasibility study approximately 110 km – 400 kV
CESI S.p.A
2024“Cold Ironing” project for the electrification of port docks.
Ports of Gioia Tauro, Porto Torres, Olbia, and Cagliari
Executive design of HV connections

Port Authority
2024“Big Fish” Project Construction of photovoltaic plants in the municipalities of Catania, Lentini, and Motta Sant’Anastasia (Sicily) with a capacity of 250 MWp.
Executive project for the HV and MV connection
SAET S.p.A.
NADARA Group

2024Rivalta generation and pumping plant and related connection works.
Feasibility study for connection to the RTN

STATKRAFT
with study
ZOLLET ENGINEERING
2024132kV ALBES AND CONNECTORS
Topographical survey and design of connections to the future 132 kV substation in Albes

DBA GROUP S.p.A.
2023-2024Project for the AT connection of a 42.124 MWp agri-photovoltaic plant located in the municipality of Adria (Rovigo)

SAET S.p.A.
NADARA Group
2023-2024Project for the AT connection of a 22.4 MWp agri-photovoltaic plant located in the municipality of Carbonia (Sulcis)SAET S.p.A.
NADARA Group
2023Executive project for the burial of medium voltage lines in the municipalities of Grezzana, Mizzole, and Terza Torre in the province of Verona (approximately 15 km).DBA Group S.p.A.
2021 - 2023380 kV power line T.378 “Rondissone – Turbigo”
Conductor replacement project.
Topographical surveys of 75 km of power lines and conductor replacement project.

TERNA RETE ITALIA
2021 - 2023380 kV power line T.L18 “Cassano – Chiari”
Executive design.
Topographical surveys of 80 km of power lines and executive project.
TERNA RETE ITALIA
In progressGoodwill servitude and development of procedures for temporary emergency employment – 380 kV Cassano - Chiari power line

TERNA RETE ITALIA
In progressGoodwill servitude and development of procedures for temporary emergency employment – 132 kV underground cables in the province of Lodi

TERNA RETE ITALIA
In progressGoodwill servitude and development of procedures for temporary emergency employment –
New 132kV underground power line Ferriera Valsabbia – S.E. Agnosine;
132kV cable connections C.P. Bagolino - Cent. Ponte Caffaro and 132kV overhead connections to C.P. Bagolino

TERNA RETE ITALIA
2021225 kV Tobene – Kounoune – Senegal line
Special support foundation project no. 160AN
AEE POWER
2020 - 2021380 kV Calenzano – Bargi power line
Variant in Carraia
Topographic surveys and crossing checks, stakeout, as-built survey.
REBAIOLI S.p.A.
2020Egypt Assets Electrification Study
Feasibility study for the connection route of the ENI PORT SAID plant to the Egyptian national electricity grid.

ENI S.p.A.
2020132 kV power line T.839 “Bobbio – Genova Molassana” LOTS 02 and 03
Safety project.
Topographical surveys of approximately 50 km of existing power lines.
Project to replace 50 supports, conductors, and guard ropes.


TERNA RETE ITALIA
2019Reorganization of the Florence Metropolitan AT Network.
Project to bury approximately 10 km of overhead power lines.
Topographic surveys.
SIRTI S.p.A.
2019132 kV power line T.844 “Vizzà – Sestri Levante”
LOTS 01-03-05
Safety project.
Topographical surveys of approximately 40 km of existing power lines.
Project to replace 36 supports, conductors, and guard ropes.


TERNA RETE ITALIA
2018220 kV power line “Goma - Buhandahanda”
Democratic Republic of the Congo
Study of the route and topographical survey of approximately 80 km and design using PLS CADD software.

AEE POWER
2018Gaza Electricity Master Plan
GIS data processing

CESI S.p.A
2016Ethiopia – Sudan Extra High Voltage Power System
Topographic Survey Report
Identification of the optimal route and electrical substations for the Ethiopia–Sudan ultra-high voltage interconnection (approximately 500 km).

CESI S.p.A
2015161 kV power line “Achimota - Mallam”
Topographic surveys and design with PLS CADD software
GRIDCO
2014Cerro Pabellon Geothermal Site (Cile)
Prefactability study of the route for the AT connection
ENEL GREEN POWER
2013220 kV “Cotaruse - Socabaya” power line in Peru
Topographic surveys and study of the Galloping phenomenon
CESI S.p.A
2010Gibe III Hydroelectric Project - 66 kV Power Line in Ethiopia
Surveying, design, and staking out of the 66 kV power line from Sodo to the Gibe III dam

WE BUILD S.p.A.
2008220kV power line “Tlemcen – Gazahouet” – Algeria
Topographical surveys and staking out of the power line.
SAE POWER LINES